So I just received an estimated build date of 9/12 for my TH. What should I expect from that info?
Sponsored
My dealer said seven weeks on average, but a halo might be longer. A TH might be even longer if there are more QC holds. Cross your fingers and hope for it by Thanksgiving.Based on what is considered "normal", six to eight weeks. But you have a halo so who knows?
Same here. The only info I got from the dealer was that it has been in Veracruz since 7/18.My truck has only ever been listed as "in build phase" in the Toyota inventory, with nothing from Toyota or my dealer as far as a delivery date.
Hopefully with almost a month in Veracruz it will be on a ship soon. Maybe a September delivery?Same here. The only info I got from the dealer was that it has been in Veracruz since 7/18.
At this point I’d be lucky if it’s a September delivery. If it goes too much longer I’m thinking of pulling the plug and waiting for the 2025’s.Hopefully with almost a month in Veracruz it will be on a ship soon. Maybe a September delivery?
I have thought about that too. We might be getting our trucks after production starts on the 2025 models, but getting a model year older trucks. I don't want to bail - I really want my truck, but when Toyota? When?At this point I’d be lucky if it’s a September delivery. If it goes too much longer I’m thinking of pulling the plug and waiting for the 2025’s.
You're getting a hybrid, correct? Most standard iForce Tacomas for North America are built in Tijuana correct?So, I ended up on a Connecticut dealer site looking for a particular truck and noticed the "Vehicle is in build status..." verbiage. What struck me was that these trucks were all built in weeks 32, 33, and 34. The estimated delivery dates were late October to early November. You won't find this on Toyota.com; it just lists them as "in build status." These were all gray-scale colors, OFs, and SR5s, non-hybrid, so nothing outlandish. My truck is a week 34 build, and I'm hoping these dates don't come to fruition.
Correct. I just talked to my guy yesterday and it's scheduled for a August 23rd build date.You're getting a hybrid, correct? Most standard iForce Tacomas for North America are built in Tijuana correct?
I locked in a TH reservation with a dealer out in Las Vegas, sales guy had me allocated for a week 34 build (halo/Guanajuato) and he said late September he'd get it delivered. I bookmarked that page and it's been taken down recently because it's probably on the factory floor switching over to a real VIN.
I ended up switching into an earlier TH delivery at their shop - and better color. But still watching this week 34 build; if it's indeed getting built this week, that's a week earlier than estimated Aug. 19th...
Hopefully supply chain & production is improving..
My Pro build week was week 30, and it was built on time on 7/27. I got the permanent vin on 7/29, but so far no arrival date and nothing further from my dealer. The truck still shows as in build phase, but I have no idea what that means. I am currently hoping it gets to Virginia by the end of September.For reference, my Pro was week 30, so end of July. It was built 8/6 or 8/7. Got the permanent vin 8/7. Arrival to dealer changed from 8/23-9/17 to 9/3-9/16. That’s all I know. Haven’t heard anything from the dealer for a couple of weeks.